Rural gravel driveway
Class 524-37 cu yd
Re-graveling an existing drive? About 4" does it. Soft or wet ground usually needs more, built up in lifts.
Free tool
Not sure how much to order? Punch in your measurements and we will get you a cubic-yard estimate for fill, gravel, sand, or topsoil. It is quick, and it adds a little cushion so you do not come up short on the job.
This is an estimate to get you in the ballpark. The exact amount depends on how the material compacts and the lay of your site. Send us your numbers and we will confirm the right quantity and a fair price before anything gets delivered.
General guidelines
A few typical jobs, to give you a feel for scale. The real amount depends on your soil, drainage, frost, and how the area gets used, so treat these as a starting point. Tell us about your project and we will confirm the right quantity.
24-37 cu yd
Re-graveling an existing drive? About 4" does it. Soft or wet ground usually needs more, built up in lifts.
16-24 cu yd
Placed and compacted in 6 to 8 inch lifts for a level, solid pad.
~8 cu yd
The building code (IRC) calls for at least a 4 inch base of clean gravel under a slab on grade.
2.5-4 cu yd
A 4 to 6 inch compacted pad keeps the shed level and sheds water away from the floor.
27-41 cu yd
Fresh topsoil settles 10 to 15 percent, so order a little extra. 6 inches gives roots the most room.
~2.5 cu yd
ICPI calls for at least 4 inches of compacted base for foot traffic, 6 to 8 where vehicles drive.
These are general guidelines, not a substitute for a look at your site or for local code and permits. Soil, slope, frost depth, and how you will use the area all change what you actually need. Give us a call and we will help you get it right.